LVP Flooring Installation in North Phoenix

Empty apartment with wooden floors, white walls, and a modern kitchen with gray cabinets and stainless steel appliances.

Quiet, Seamless Floors—Prepped for Performance

We address subfloor flatness up front, add moisture/vapor control where required, and install transitions and trim for a clean, continuous look through living spaces. Serving north-of-101 neighborhoods including Arrowhead Lakes (85308), North Peoria (85383), and Desert Ridge (85050).

How Ironvine Is Changing the
Tile & Flooring Space in North Phoenix

  • Flawless Detail

    Clean lines don’t happen by accident. We plan layouts before a single tile is set, prep the right way (leveling, crack-isolation where needed), and place movement joints so floors and showers last. Finishes, grout lines, edges, transitions are checked against the plan, then walked with you before we call it done.

  • Transparent Price

    No vague allowances, no “TBD.” You get a clear, line-item estimate in plain English, and any change happens only with a written change order you approve. You’ll always know what’s included, what it costs, and when it’s scheduled, so there are zero surprises at the end.

  • Dust-Free Work

    Remodels shouldn’t coat your home. We contain work zones with plastic and zip walls, run HEPA filtration, protect paths and vents, and clean as we go. Demo and cutting are handled with dust control at the source, so your living spaces stay livable while we work.

  • On-Time Delivery

    Your calendar matters. We give realistic start and finish dates, show up when we say, and communicate daily so you’re never guessing. If something changes, you hear it first, and we adjust the schedule with you, not to you.

Questions We Often Get About Shower Tile & Bathrooms

  • Yes—when required by the product and site conditions. We follow manufacturer specs to protect your warranty.

  • No, we prefer to follow best practices by removing the existing floor completely and replacing it.

  • Many projects finish in 1–3 days depending on prep, layout, and room count. We’ll confirm dates in writing.

  • We install matching transitions and base/quarter-round as scoped so rooms tie together cleanly.

Schedule Your Free Consult
Try Our Calculator

Ready to experience the Ironvine difference?

Schedule Your Consult